| Description | Three albums containing the following:
Album 1- Experimentation
- Page 1 Top Radial fracture in perspex 7.12.76, Perspex column detonation 20.5.77 - Page 2 Rolls Royce engined Holden & Brooke pump control valves 3.10.78, Constant head injection tests 18.1.79 - Pages 3 - 4 Assembling 100 of blasting gelatine into RH8B 28.2.79 - Page 5 Split packer from setting line failure 26.7.79 - Page 6 Output-flow monitoring 26.7.79, C.S.M- built container for FS20 firing module - Page 7 Filming for 'Tomorrow's World' 26.7.79 - Page 8 Perspex detonated for 'Tomorrow's World' - Page 9 Recovered explosive 16.8.79, Pump Installation and monitors RH7C 18.2.80 - Page 10 Surface flow monitoring arrangement 18.2.80, Harwell tracer monitoring system - Page 11 Circulation look computer controlled monitors 18.2.80, Venting 3 holes 18.2.80 - Page 12 First attempt to fire TATB charge- preperation of charge 18.4.80, Placing of charge 18.4.80 - Page 13 Detonation of TATB charge RH9D ( explosive stimulation of hole) 2.10.80 - Page 14 Acoustic monitoring equipment 2.10.80 - Page 15 M.T.S Test Work 8.8.80 - Page 16 Top end of explosive toll after firing 5m of TATB 11.11.80, Venting, Venting - Page 17 Noise monitoring Test Equipment 26.11.80 - Page 18 TATB test charge unit 11.11.80 - Page 19 Running- in hydrophone unit 1.5.81 - Page 20 Wimpey Hydrophone 1.5.81 - Page 20 Running-in Sclumberger tool RH12 16.9.81
Album 2 - Machine Employed On Site
- Page 1 Holman rig 17.4.78 - Page 2 Holman rig 17.4.78 - Page 3 Rolls Royce powered Holden & Brooke s.50 pump rig 15.8.78 - Page 4 Valves and controls on Rolls Royce powered pump rig 15.8.78 Holman and Gryphon rigs 11.9.78 - Page 5 Gryphon rig, Gryphon & Holman rigs 11.9.78 - Page 6 Original Geothermal Staff 18.1.79 - Page 7 Halliburton Twin T.10 pump 20.3.80 - Page 8 Oil storage tank being sited 23.4.81, 17 1/2 tungsten button bit 9.9.81 - Page 9 B.J Hughes Hydro- frac. pump 1.5.81 - Page 10 N.C.B winch for borehole CCTV system 5.10.81 - Page 11 Arrival of the Kenting Drill rig at Rosemanowas - Pages 12 - 27 Rig assembly 10.8.81 - Pages 28-31 The completed rig - Page 32 Casing handler, Rige generator 23.10.81 - Page 33 Casing work on completion of drilling of the first hole 23.10.81 - Page 34 Preperations to move the rig 31.10.81 - Page 35 Moving the rig 1.11.81 - Page 36 Moving the Rig and associated equipment 1.11.81 - Page 37 Moving the slurry Tanks 1.11.81 - Page 38 The Move is completed and the rig repositioned over the second well head 1.11.81 -Pages 39 - 40 Moving the Rig 1.11.81
Album 3 - Site progress and Buildings
- Page 1 Portakabin installation at Trevenson - Page 2 Site (West End) 26.7.79 - Page 2 Site (East End ) 8.8.1980 - Page 3 Trolvis Quarry (water supply) - Page 3 Installation of Pipeline 31.10.80 - Page 4 Site development 31.10.80 - Page 5 Pipe Installation 31.10.80 - Pages 6 - 7 Site Development 31.10.80 - Page 8 Rock Bolting and dressing of South face 18.11.80 - Page 9 Pipe Cutting and Fusion 25.1.81 - Pages 10 -12 Site Progress 25.1.81 - 27.1.81 - Page 13 - Cellar Foundations 25.2.81 - Page 14 Site progress 25.2.81 - Page 15 Construction of cellars; 25.2.81 - Page 16 Cellars 18.3.81, Dam Construction 18.3.81 - Page 17 Site Progress 25.2.81 - Page 18 Cellars 31.3.81 - Page 19 Cellars 31.3.81, Positioning of R.S.J. s 23.4.81 - Page 20 R.S.Js in position over cellars 28.4.81 - Page 21 RH12 well 17.7.81, Site 5.8.81 - Page 22 Site (west end), Completion of the Approach Road and Entrance 5.8.81 - Page 23 Site 5.8.81, Public viewing gallery - Page 24 Inside the cellars immediatley prior to drilling 5.8.81
|