| Description | Including:
- 'The Thames Landscape Strategy Hampton to Kew: Draft for Consultation' (1994); - 'The Thames Landscape Strategy Hampton to Kew' (1994); - Correspondence with Thames Landscape Strategy and related paper (1995); - 'Tidal Thames: Landscape Assessment and Design Guidelines', produced by the Environment Agency (1996); - 'Environment and Conservation Review 2002: Care, respect and performance', produced by Thames Water: - 'An Environmental Strategy for the Millennium and Beyond', produced by the Environment Agency (1997); - 'The Millennium riverbank experience', produced by the Environment Agency; - 'River Wylye Low Flow Study: Progress and further investigations', produced by the Environment Agency; - 'Partnership in Planning': Riverbank design guidance for the Tidal Thames' by the Environment Agency; - Leaflets and pamphlets conerning the Thames, produced by the Environment Agency; - 'Connecting with London's nature: Highlights of the Mayor's Draft Biodiversity Strategy' (2001); - 'Connecting with London's nature: The Mayor's Draft Biodiversity Strategy' (2001); - and 'Trends in Thames-side Planning Applications: 1986-1999: Monitoring Report Consultation Draft', produced by the London Rivers Association (1999). |